Memorabilia

2018

March,initiate greening project around the enterprise

May, itwas identified as top-10 industrial enterprise, advanced enterprise of integratingIT application with industrialization

May, H-shapedsteel won the title of famous brand in Hebei Province

June, itbecame the Chinese green development league council member

October,it completed denitrification, de-plume, power generation smoke deep desulfurizationtreatment.

November,it has become the strategic cooperation partner with North China University ofScience and Technology

November,it has passed municipal technical center certification

December,it gained the honorary title of national high-tech enterprise

2017

April,80MW generation unit was put into operation

July,optimization engineering was initiated for the company’s equipment andlogistics

August,energy performance enhancement diagnosis was carried out with Tsinghua Tongfang

November,blast furnace slag washing water heating engineering was put into operation

December,it was successfully identified as Grade C R&D institute of Hebei Province.

2016

March,700 stripe steel was put into production

October,H-shaped steel passed MC certification

2014

April,sewage treatment station was put into use

September,H-shaped steel passed Europe standard certification

2013

June,testing center was recognized by the laboratory

July, itpassed H-shaped steel JIS certification

September,20MW power generation was put into production

September,ultrafine powder was put into production

2012

January1, south area 2# converter was put into production

March27, 320 sintering machine was put into production

March31, 1080 blast furnace was ignited for blowing-in

April30, H-shaped steel was put into production

April,slag micro mist was put into production

June,30000 oxygen generation was put into production

September,two high lines were put into production

2009

April,it was renamed as Hebei Tianzhu Steel Group Co., Ltd.

July, 3#blast furnace after technical transformation was put into production

July, steelrolling line 2 was put into production

2008

January2, 3# converter was put into production

May 3,10000 oxygen generation was put into production

October,it passed ISO14001 and ISO18001 system certification

November,1# blast furnace after technical transformation was put into production

December,2# blast furnace after technical transformation was put into production

2006

April10, 110KV substation was put into operation

April 13th,84 m2 sintering machine was put into production

April25, 2# converter was put into production

May, 2sets of 6500 oxygen generation were put into production

November21, steel-rolling heat load test run

2005

February14, lime kiln was put into production

May 17, 3#blast furnace was ignited for blowing-in

2004

October 15,1# blast furnace was ignited for blowing-in

October20, sintering machine was ignited for production

October30, 2# blast furnace was ignited for blowing-in

November18, 1# converter was put into production

November,4500 oxygen generation was put into production

2003

Establishment of Tangshan Tianzhu Steel GroupCo., Ltd was initiated.

2002

Tangshan Hengtai Steel Co., Ltd was founded.

1996

Yushunlonggong Trading Co., Ltd was founded.

Tel.:+86-0315-3319309 8733518    Address: East to Village Yinguantun, Fengrun District,Tangshan City, Hebei Province   Fax:+86-0315-8733866       Email:tzgt@www.ro2sea.com